station capacity

英 [ˈsteɪʃn kəˈpæsəti] 美 [ˈsteɪʃn kəˈpæsəti]

网络  发电厂容量

电力



双语例句

  1. Relationship Analysis on Station Capacity and Passenger Flow: A Case of Beijing Subway Line 1
    北京地铁1号线车站设施与客流关系分析
  2. The Calculation Method Research of Railway Station's Carrying Capacity and System Development
    铁路车站通过能力计算方法研究与系统开发
  3. The coordination of marshalling station capacity and train diagram capacity is a dynamic capacity coordinating process between stations and lines.
    编组站能力与运行图能力的协调是一个动态的点线能力协调过程。
  4. Research on Integrated System of Marshalling Station Capacity based on graphic method
    基于图解法的编组站能力综合系统研究
  5. Maximum assembling is the core of the design of the railway passenger station capacity and scale.
    摘要最高聚集人数是研究铁路客运站站舍能力与规模的核心。
  6. Railway station system belongs to the complicated system, the occupation time of technical operation on fixed equipment is one of the essential for calculating station capacity.
    铁路车站属于复杂系统范畴,其技术作业占用固定设备时间是计算车站能力的基本要素之一。
  7. The application of the intake slope of Xiaowan Hydropower Station demonstrates the capacity of this method.
    小湾水电站进水口边坡算例体现了该方法的工程应用能力。
  8. Passenger Movement at Comprehensive Transport Pivot of Railway Station and Facilities Capacity Prediction
    火车站综合交通客运枢纽客流与设施容量预测分析
  9. With scaling up of power station's capacity, the cable fire detection system looks more important.
    随着火电厂容量的增加,电力电缆的火灾预警监测显得越来越重要。
  10. The Solution of the Design of the Automation System in Minisize Hydropower Station with Unit Capacity under 1 000 kW
    单机1000kW以下微型水电站自动化系统设计解决方案
  11. To collect thorough and logical raw data is the basis for calculating the station carrying capacity.
    采集完备而合理的原始数据是计算车站通过能力的基础。
  12. Study on the Comprehensive and Integrated Calculation System for Railway Station Capacity
    铁路车站能力计算综合集成系统的研究
  13. Methods of Small Hydropower Station Unit Capacity Enlargement and Reform in Rural Areas
    农村小水电站机组增容改造的方法
  14. The characteristics of power system development are as follows: the increasing of overall capacity of power station and capacity of a single generator, the prolonging distance of transmitting electricity, and loads far away from power source with intense fluctuation.
    电力系统的发展的重要特征是:电站总容量及单机容量增大,输电距离延长,负荷远离电源且波动剧烈。
  15. This paper presents a general method to compute the carrying capacity and resorting capacity of marshalling station by computer simulation, which includes the generation of train flows, the simulation model of marshalling station operation process and the determination of station integrated carrying capacity.
    利用计算机模拟法计算编组站通过能力和改编能力的一般方法,包括到达流的生成、编组站技术作业过程的模拟模型和车站最终能力的确定等三个方面。
  16. A Method of Calculating the Passenger Station Capacity
    客运站能力计算方法
  17. This paper analyzes the contradiction between traditional calculation methods of technological station's capacity and existed unbalanced transportation conditions, then gives emphasis to analyze the influential factors of technological station capacity under unbalanced transportation.
    在深入分析既有的技术站能力计算体系及相关因素的基础上,提出了一套基于非均衡运输条件下的技术站能力计算公式体系。
  18. Thirdly, need to use combinatorial method to reflect the station passing capacity and the inscape of it.
    三是要以组合能力的概念和方法反映客运专线客运站的通过能力及能力构成的特点。
  19. Method for Data Processing in Calculating Station Carrying Capacity
    车站通过能力计算中的数据处理方法
  20. According to the demand of passenger station capacity calculation, the paper discusses relevant requirements on data collecting, data analysis and data standardization, etc.
    根据客运站能力计算的需要,论述了数据采集、数据分析、数据规范化等有关要求。
  21. The paper introduces the features of innovation design on Oxygen Making Station ( capacity: 10 000Nm3/ h) in Nanchang Iron and Steel Works.
    介绍南钢10000Nm3/h制氧站创新设计的特点。
  22. Finally in Harbin Power Station Equipment Group, for example, the analysis of its growth should choose the path of technological innovation, and technological innovations aimed at improving the Group of Harbin Power Station capacity problems given the response and recommendations.
    最后以哈尔滨电机厂为例,分析出其应该选择增长技术创新能力的路径,并针对哈尔滨电机厂提高技术创新能力存在的问题给出了对策和建议。
  23. Pre-desulfurization of hot metal has become an important task for clean steel production. The final sulfur content is a key index of desulfurization station for capacity and efficiency evaluation.
    铁水预处理脱硫是纯净钢生产中的一项重要任务,其中铁水终点硫含量是反映脱硫站能力和生产效果的重要指标。
  24. Primary Study on Calculation Methods of Technological Station Capacity Under Unbalanced Transportation Conditions
    非均衡运输条件下技术站能力计算方法的初步探讨
  25. With the quick increase of railway station's capacity, imminently need a suit of software to achieve the capacity assessment job.
    随着车站能力的迅速增长,迫切需要一套成熟的软件来实现能力的查定工作。
  26. Finally the hub station capacity is forecasted. 3. Comprehensive passenger hub layout plan.
    最后,对综合客运枢纽站务作业量进行预测。三、综合客运枢纽布局规划。
  27. According to the generation mechanism of cascade hydropower stations, the thesis looks for the relationship between natural inflow, hydropower station capacity, power head and other parameters, establishes the power cogeneration model of cascade hydropower stations.
    根据梯级水电站的发电机理,寻找自然来水量、水电站库容、发电水头等参数之间的关系,建立梯级水电站群联合发电模型。
  28. The summary is as follow: The railway station capacity is discussed with the station equipments and their using process.
    本论文研究内容涵盖以下要点:车站能力是对车站设备及其运用过程而言的。
  29. With the modernization of the marshalling station middle-small capacity hump, combined switch-line control and speed control computer controllable retard-unit system gain its continuing development and application, but also expose some shortcomings on speed control.
    随着编组站中小能力驼峰的现代化改造,进路与速度控制合二为一的微机可控顶控制系统得到了不断的推广与应用,但在实际的应用中也暴露了该系统在速度控制方面存在的一些不足。